Auburn Examiner

Traffic Alert: Lea Hill Bridge Construction to Begin Monday

Traffic barrels and cones surround a road construction site with a large electric sign with an arrow pointing left in the background

Shutterstock

Advertisement

Construction on the Lea Hill bridge is scheduled to begin today, Monday, March 28. Alternate routes are highly recommended during this period as delays should be expected in both directions. Expected work times are from 7:00 a.m. to 4:00 p.m. Monday through Friday.

Pedestrian access will be accommodated through the work zone. Access to businesses and residences will remain open during construction.

Advertisement

The work on Lea Hill Bridge is anticipated to be completed end of May 2022. There may be times throughout construction when only one lane is open for both lanes of traffic with flagger-controlled alternating traffic. Again, delays are expected and alternate routes should be taken.

This is a major route for emergency vehicles to reach Lea Hill. Please move over for all emergency vehicles responding to a call.  

City of Auburn

Area residents should also be aware of noise caused by construction work.

Check traffic before you go with Auburn’s real-time traffic photo wall: Auburn WA Traffic Wall, Lea Hill Road (link)

Advertisement

Impacts to Other Roads

For those who do not frequent the Lea Hill bridge, please anticipate construction-related traffic and delays to impact nearby roads. Those familiar with rush hour traffic at the M St NE/8th St NE intersection know this intersection is likely to be affected by any bridge delays. Other roads that may be affected:

Harvey Rd
8th St NE
M St NE
R St NE
104th Ave SE
Green River Blvd

Advertisement

Residents and guests of the following complexes should be aware of and prepare for any construction-related traffic:

Regal Apartments
Neely Station Apartments
Riverside Village Apartments
Riverfront Apartments

This type of work is highly weather dependent, which may require longer than anticipated. Construction may also be re-scheduled without notice.

If you have any questions related to this project, please contact:
Kim Troung, City of Auburn Project Manager: 253-804-5059
Taylor Fay, City of Auburn Construction Inspector: 253-804-5038
Kyle Smith, Contractor Representative for Combined Construction: 425-622-7298

The above information was obtain from the City of Auburn.

Advertisement
Exit mobile version