traffic alert, traffic advisory, auburn traffic, traffic advisory, city of auburn, road constructionThe following road projects will be starting or continuing in Auburn during the week of Monday, September 6th to Friday, September 10th.  Unless otherwise noted, access to residences, businesses, and sidewalks within the project area will be maintained during construction, but delays should be expected.

These projects may change unannounced due to the weather or unforeseen circumstances. There may be additional projects we have not received notice of.

Advertisement

Remember to check traffic before you go (check our Traffic page) and always leave with plenty of time in case of unexpected delays.

itcanwait, it can wait, don't text and drive

Monday:

Location: Lakeland Hills Way from Evergreen Way SE to 69th Ave SE
Work:
Project Work
Dates and Times:
Monday, May 24, 2021 – Friday, September 17, 2021, 7:00 AM – 6:00 PM (continuing)
Impact: Lane closures
For More Information Please Contact:
Seth Wickstrom, Project Engineer, (253)804-5034
Debra Alvarez, Construction Inspector, (253)876-1922

Advertisement

Location: Lakeland Hills Way from Evergreen Way SE to Lake Tapps Dr SE
Work:
Project Work
Dates and Times:
Monday, June 17, 2021 – Friday, September 17, 2021, 7:00 AM – 6:00 PM (continuing)
Impact: Lane closures
For More Information Please Contact:
Seth Wickstrom, Project Engineer, (253)804-5034
Debra Alvarez, Construction Inspector, (253)876-1922

Tuesday:

Location: Auburn Way North from 15th Street NE to 21st Street NE
Work:
Private Utility Work
Dates and Times:
Tuesday, September 7, 2021 9:00 am – 3:00 pm
Impact:
Lane Restrictions and disruptions to both directions of traffic, Pedestrian Access is Accommodated through the Work Zone.
For More Information Please Contact:
NorthSky Communications Representative, Alex Bartells at 253-455-2798 or City Inspector, Josh Linkem at 253-876-1926


Wednesday:

Location: 15 St NE at BNSF Railroad Tracks
Work:
Maintenance Work
Dates and Times:
Wednesday, September 8, 2021, 8:30 AM – 4:00 PM
Impact: Lane closures. Pedestrian Access is Closed, Detour in Place
For More Information Please Contact:
City of Auburn Project Manager, Scott Nutter @ 253-804-5068


Thursday
:

Advertisement

Location: 15 St NW at UPRR Tracks
Work:
Maintenance Work
Dates and Times:
Thursday, September 9, 2021, 9:00 AM – 4:00 PM
Impact: Lane closures. Pedestrian Access is Closed, Detour in Place
For More Information Please Contact:
City of Auburn Project Manager, Scott Nutter @ 253-804-5068


Friday:

Continuing Work

Continuing Projects:

The following projects are continuing into and/or through the week of September 6th-10th

Location: Auburn Way North/South – 4th St SE to 22nd St SE
Work:
City Pavement Preservation Project
Dates and Times:
Weekdays 7:00 AM – 4:00 PM
Impact: Disruptions to both directions of traffic on weekdays 

Location: M Street SE from 8th Street SE to Auburn Way South
Work:
City Sidewalk Project
Dates and Times:
Weekdays 7:00 AM – 5:00 PM
Impact: Disruptions to southbound lane(s) Monday through Friday

Location: State Route 164 east of Auburn 
Work:
Building a new 170-foot long bridge over Pussyfoot Creek
Dates and Times:
Monday, July 1 – estimated 90days 
Impact: Road Closed, detours in place

  • Passenger vehicles can use 212th Avenue Southeast and Southeast 400th Street. Part of this route is not suitable for large commercial vehicles.
  • Commercial vehicles will use SR 169 and Southeast 400th Street. These roads are better able to accommodate large trucks.

Other Alerts:

The following projects may impact traffic in and around Auburn 

  • City of Pacific started construction on their Stewart/8 St E Widening project, impacts to traffic and delays should be anticipated within the south end of the City and into Pacific and Sumner.
  • The State Department of Transportation is constructing their NB SR 167 HOV lane project between SR410 and SR18. This project will include detours of traffic from SR167 using local roadways, impacts to traffic and delays should be anticipated.
  • The State Department of Transportation is also doing night work on SR18 to replace/repair the median barrier from Federal Way through Auburn and will impact traffic at times.

White River Amphitheater:

The next concert scheduled at the WRA is on September 17th

The above information was provided by the City of Auburn.

Advertisement
More from TransportationMore posts in Transportation »
Advertisement

Be First to Comment

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

WP2Social Auto Publish Powered By : XYZScripts.com